1. Home
  2. Case studies
  3. Multi-Plant Industrial & Utility Operations

Digital Twin · Live for over a year

What changed for a UAE operator that has run our digital twin for over a year.

We connected 40,000+ sensors across 6 plants in two countries into one governed Digital Twin — replacing manual weekly spreadsheet assembly with automated technical reporting and plain-language answers.

  • SCADA & Plant Historians
  • PLC Telemetry (40,000+ tags)
  • Energy & Utility Sub-Meters
  • Maintenance & Work Order Logs
What changed for a UAE operator that has run our digital twin for over a year.[Client name, pending approval] · UAE Industrial Operator

Measured scope

40,000+sensors connected
6 plantsacross two countries
1+ yearlive in daily plant operations
[Result]one measured result, to add

Before

Before: Weekly report, built by hand

  • Operational data sat separately across plant SCADA systems, historians, ERP records, and local spreadsheets.
  • Every week, engineers exported CSV files from several systems and stitched reports together by hand.
  • Plant and executive leaders had to wait days for someone to pull numbers and explain why energy or output changed.
  • Early equipment drift was buried inside raw tag histories until an alarm tripped.

After

After: Asked in plain language, backed by the source

  • 40,000+ sensor tags across 6 plants in two countries flow into one governed source of truth.
  • Technical and operational reports are produced automatically on schedule without manual spreadsheet work.
  • Leaders ask questions in plain language — such as “Is energy use linked to output at this site?” — and see the trend by unit with the source tag behind every number.
  • Maintenance and operations teams spot rising bearing temperatures and efficiency drift early enough to plan work in a normal shift.

Architecture & rollout

How we built and rolled out the Digital Twin

  1. Layer 1 & 2 · Mapped and unified 6 plants into one governed data platform — Standardized asset hierarchies, tag naming, and time-series ingestion across six facilities in two countries.
  2. Layer 3 · Added health, energy-to-output, and anomaly models — Configured continuous pattern monitoring across critical rotating assets, utilities, and production units.
  3. Layer 4 & 5 · Launched automated technical reports & plain-language Q&A — Gave plant heads and executives self-serve answers where every chart cites the underlying unit and sensor source.

Book a 30-minute call, and we will start where you are.

Tell us what you are looking at and pick a time that suits you. The call goes to the person who handles that kind of project, so you do not have to explain yourself twice.

1Answer six short questions
2Pick a slot on our live calendar
3The call opens at the right stage for you
What are you looking at?
Where are you today?
Pick a slotGulf Standard Time
Book a call