1. Home
  2. Digital Twin
  3. One Governed Source of Truth for Your Plant Data

Digital Twin · Layer 2: Ingest and store

“Our data sits in SCADA, ERP and spreadsheets.”

One Governed Source of Truth for Your Plant Data

We connect your SCADA, PLC, MES, ERP, QMS, IoT sensors, and shift spreadsheets into one clean, governed operational data layer that every team and model can trust.

For Head of OT/IT, Plant Manager, Operations Director, and Data Engineering Lead

01 · PHYSICAL PUMP SKID02 · LIVE DIGITAL TWIN MIRRORVIBRATION · 2.1 mm/sBEARING TEMP · 78°C ↑PRESSURE · 6.4 barFLOW · 420 m³/hIllustrative: physical pump and motor connected to its live Digital Twin mirror.
Live SCADA readings, maintenance records, ERP spares, and robot inspection rounds brought into one place.20–40s live walkthrough slot

01How it works in 3 steps

Connect what you have, analyse the pattern, and act early.

  1. 01

    Read-only connectors to your existing systems

    We ingest live telemetry and batch records from OPC-UA, Modbus, MQTT, SCADA historians, SAP/Oracle ERP, CMMS, and manual logs.

  2. 02

    Clean, align timestamps, and map to assets

    Every tag and maintenance record is validated, time-aligned, and mapped to the physical line, pump, valve, or zone it belongs to.

  3. 03

    Serve one reliable feed to teams and models

    Engineers, plant heads, and predictive models work from the exact same numbers — ending weekly spreadsheet reconciliation.

02Proven outcomes

What changes on your plant floor or site

01

End manual report building

Stop exporting CSV files from four systems every week just to see how the plant ran.

02

Traceable numbers

Every KPI and alert links directly back to the underlying sensor tag, work order, or batch record.

03

Ready for predictive models

Once your asset hierarchy is clean, adding predictive maintenance or energy models takes weeks, not years.

Where it fits

Where the Data Platform fits

Built for teams whose data already exists inside plant systems, but cannot be combined across operations, maintenance, quality, and finance.

Timeline: 4 to 6 weeks for the first site or production line

Assets, lines & sites

  • Multi-line factories with mixed-vendor PLCs and SCADA
  • Water and power utility networks with distributed stations
  • Multi-site industrial groups standardizing reporting across plants

Systems & tags we connect

  • DCS
  • SCADA
  • PLC
  • MES
  • ERP
  • QMS
  • IoT sensors
  • Spreadsheets

03Proof

Proven across 40,000+ live sensors and 6 plants

For a UAE operator, we replaced manual weekly reporting across several systems with a single governed twin spanning six plants in two countries.

40,000+sensors connected into one model
6 plantsunified across two countries
100%automated weekly technical reports

What the first step looks like

Map your data sources with our engineering team

In a 30-minute call, tell us which systems hold your operational, maintenance, and ERP data today. We will show you how we connect them without touching control loops.

  • Connector plan for your SCADA, PLC, MES, and ERP stack
  • Security and read-only data governance review
  • Fixed-scope timeline to bring your first line or station into one place

04FAQ

Common questions from operations & engineering teams

Straight answers on data readiness, plant safety, and fixed-scope pilot timelines.

Do we have to rip and replace our current SCADA or ERP?
No. We sit on top of your existing SCADA, PLC, MES, and ERP systems using read-only connectors. Your control systems remain untouched.
Can this run on-premise or in a UAE sovereign cloud?
Yes. We deploy on-premise inside your plant network, in your private cloud, or in UAE-resident cloud regions according to your security policy.

Book a 30-minute call, and we will start where you are.

Tell us what you are looking at and pick a time that suits you. The call goes to the person who handles that kind of project, so you do not have to explain yourself twice.

1Answer six short questions
2Pick a slot on our live calendar
3The call opens at the right stage for you
What are you looking at?
Where are you today?
Pick a slotGulf Standard Time
Book a call