- Home
- Digital Twin
- One Governed Source of Truth for Your Plant Data
Digital Twin · Layer 2: Ingest and store
“Our data sits in SCADA, ERP and spreadsheets.”
One Governed Source of Truth for Your Plant Data
We connect your SCADA, PLC, MES, ERP, QMS, IoT sensors, and shift spreadsheets into one clean, governed operational data layer that every team and model can trust.
For Head of OT/IT, Plant Manager, Operations Director, and Data Engineering Lead
01How it works in 3 steps
Connect what you have, analyse the pattern, and act early.
- 01
Read-only connectors to your existing systems
We ingest live telemetry and batch records from OPC-UA, Modbus, MQTT, SCADA historians, SAP/Oracle ERP, CMMS, and manual logs.
- 02
Clean, align timestamps, and map to assets
Every tag and maintenance record is validated, time-aligned, and mapped to the physical line, pump, valve, or zone it belongs to.
- 03
Serve one reliable feed to teams and models
Engineers, plant heads, and predictive models work from the exact same numbers — ending weekly spreadsheet reconciliation.
02Proven outcomes
What changes on your plant floor or site
End manual report building
Stop exporting CSV files from four systems every week just to see how the plant ran.
Traceable numbers
Every KPI and alert links directly back to the underlying sensor tag, work order, or batch record.
Ready for predictive models
Once your asset hierarchy is clean, adding predictive maintenance or energy models takes weeks, not years.
Where it fits
Where the Data Platform fits
Built for teams whose data already exists inside plant systems, but cannot be combined across operations, maintenance, quality, and finance.
Timeline: 4 to 6 weeks for the first site or production lineAssets, lines & sites
- Multi-line factories with mixed-vendor PLCs and SCADA
- Water and power utility networks with distributed stations
- Multi-site industrial groups standardizing reporting across plants
Systems & tags we connect
- DCS
- SCADA
- PLC
- MES
- ERP
- QMS
- IoT sensors
- Spreadsheets
03Proof
Proven across 40,000+ live sensors and 6 plants
For a UAE operator, we replaced manual weekly reporting across several systems with a single governed twin spanning six plants in two countries.
What the first step looks like
Map your data sources with our engineering team
In a 30-minute call, tell us which systems hold your operational, maintenance, and ERP data today. We will show you how we connect them without touching control loops.
- Connector plan for your SCADA, PLC, MES, and ERP stack
- Security and read-only data governance review
- Fixed-scope timeline to bring your first line or station into one place
04FAQ
Common questions from operations & engineering teams
Straight answers on data readiness, plant safety, and fixed-scope pilot timelines.
Do we have to rip and replace our current SCADA or ERP?
Can this run on-premise or in a UAE sovereign cloud?
Book a 30-minute call, and we will start where you are.
Tell us what you are looking at and pick a time that suits you. The call goes to the person who handles that kind of project, so you do not have to explain yourself twice.
