01Fixed-scope pilot

Try it on one line, route, or station first.

A fixed-scope pilot on one line, route, or asset keeps your risk small and shows you the measured result on your own site before you commit to more.

One pumping station, production line, or grow zone6 to 8 weeks

Track 1 · Digital Twin Pilot

One pumping station, production line, or grow zone

We connect read-only SCADA, PLC, and maintenance records on one bottleneck asset group, build its live health and energy mirror, and deliver plain-language alerts and automated weekly reports.

  • Source-of-truth connector setup on your selected line or station
  • Live asset health & anomaly model (bearing heat, pressure, OEE, or kWh/unit)
  • Role-based view + plain-language Q&A for your operations and maintenance leads
  • End-of-pilot measured ROI review before any plant-wide rollout
Scope this pilot on a 30-minute call
One inline quality camera station on your conveyor4 to 6 weeks

Track 2 · Visual Inspection Pilot

One inline quality camera station on your conveyor

We test our vision model on sample good and defective units from your line, mount an industrial camera over one inspection point, and flag defects in real time.

  • Offline model accuracy test on your product defect samples
  • Inline camera + lighting setup over one inspection station
  • Real-time defect bounding box alert + timestamped quality log
  • Full accuracy & reject-rate report at pilot completion
Scope this pilot on a 30-minute call
One night security patrol route or equipment gauge corridor4 to 6 weeks

Track 3 · Autonomous Patrol or Gauge Round Pilot

One night security patrol route or equipment gauge corridor

We walk your site, map one perimeter patrol route or analog-gauge corridor, and run scheduled autonomous rounds feeding your security desk or Digital Twin.

  • Site route, blind-spot, and surface survey
  • Scheduled autonomous patrol or gauge/thermal reading rounds
  • Live alerts to your security control room or Digital Twin
  • Complete route audit log and scale-up recommendation
Scope this pilot on a 30-minute call

Layer 1 · Foundation

Not sure which line or station to pick?

Start with our 2-week Data & Digital Twin Maturity Assessment so we can score your sources and recommend the highest-payback pilot.

See Maturity Assessment →

Scope your single-line or single-route pilot.

Tell us what you are looking at and pick a time that suits you. The call goes to the person who handles that kind of project, so you do not have to explain yourself twice.

1Answer six short questions
2Pick a slot on our live calendar
3The call opens at the right stage for you
What are you looking at?
Where are you today?
Pick a slotGulf Standard Time
Book a call